School District of Reedsburg makes last ditch effort to sell residents on referendum for new middle school

Thu
29
Oct

School District of Reedsburg makes last ditch effort to sell residents on referendum for new middle school


Webb Middle has underground tunnels that contain pipes and other infrastructure. The tunnels are also used for maintenance efforts. This is an outdated method of building that causes problems with water. Webb is in a floodplain, which means there is always water in the tunnels, even when it hasn’t rained in weeks. At best, the floor of the tunnels is damp. At worst, during flood conditions, the water is well over the roof of the tunnels and flowing into the main floor of the school. In order to combat mold caused by this moisture, the District relies on the heating system, industrial-size dehumidifiers, and window air conditioning units (Webb doesn’t have central air conditioning). A new school would not have underground infrastructure, nor would the building be constructed in a floodplain. A new school would also have central air with an updated HVAC system, which would do a better job of keeping even temperatures throughout the school. (Photos by Heather Stanek)

This fall, the School District of Reedsburg has been doing all it can to inform residents about why it needs a referendum for a new middle school.

 

 


Full text available to subscribers only. If you are a current subscriber, please use the login below to continue reading this article. To become a subscriber, please click here.